Between Quirindi and Willow Tree the speed limit of the train was increased to 60km/h. At Willow Tree the locos were stopped and bearing temperatures checked again. The temperatures were found satisfactory, with 8649 reading 1 degree below a spot comparison bearing measurement on 8131. After Willow Tree we all rode in the cab of 8131, with the Progress Rail fitter being dropped off so he could return to Werris Creek. Here the locos are shown after the checks have been made and we are waiting to depart. Photo by Michael McGinty [4/12] |