start previous pagenext page end   108
THIRD DECADE  
A 4700-kVA 3000-r.p.m. machine made in 1923 was the largest single-phase generator that had been built. It was fitted with a new type of damper winding developed by the Company to eliminate the troubles experienced on the smaller two-pole single-phase machines. Another special machine was made for the Cavendish laboratory at Cambridge, where in 1925 Kapitza and Cockcroft were carrying on early research work in nuclear physics under Rutherford. The' Rutherford generator', as it was known in the shops, was designed to supply a current of 72,000 A to a small coil for the production of magnetic fields of high intensity.

Auxiliary generating plant for use in ships included a large number of a.c. sets made in 1920 for forty oil tankers. This was the first time that an a.c. system had been used for marine auxiliaries, and the equipments are giving good service on those vessels still afloat.

TRANSFORMERS
To meet the progressive increase in transmission voltages, the Company manufactured transformers for 88-kV service in Tasmania in 1921, for 110-kV and 115-kV service in New Zealand and Russia in 1923, and for 132-kV service in South Africa in 1924. The South African transformers went to the Victoria Falls and Transvaal Power Company as part of the first order for British-made 132-kV equipment, transformers and switchgear. This was an epoch-making event, four years before the British grid, and the experience gained was of great value in designing 132-kV equipment for the home market.

In 1928 when work began on the grid the Company was commissioned to build 132-kV transformers for Central Scotland. These were fitted with on-load tap changing, which was unusual at such high voltages; a new design of tap changer was evolved, and the first equipments are still in service. Even higher voltages were required overseas, a 33,000-kVA transformer group being supplied for 145-kV service in South America.

Transformer cooling methods began to change from water cooling to air cooling. Water-cooled oil coolers with forced oil circulation gave place to radiators for natural cooling up to half full load, with fans and oil circulating pumps for mixed cooling up to full output.

In the early days groups of single-phase transformers were used on three-phase systems, but as the use of electricity increased and greater capacities were required it became more economical to build and use three-phase transformers. To solve the transport problem a 120-ton railway truck of the side girder type was designed in conjunction with the railway companies to enable the full height of the loading gauge to be used. Road trailers were made to carry similar loads so that the largest transformers could be shipped direct to the docks.